Pages Tagged With: "pump station"
Ribera Development LLC proposes to install a pumping station, force main, gravity sanitary sewer main, and manholes to serve 107 single family units and additional facilities in a proposed subdivision located in Harbeson.
Jack Lingo Asset Management proposes to install a pump station, force main and gravity sewer lines to serve 13 apartment buildings and 2 residential lots located at West Denney’s Road, southwest of Carlisle Drive, in Dover.
Double H. Development, LLC proposes to install a pump station, force main and gravity sewer system to serve 584 dwelling units located southwest of intersection of Pepper Road and Thatcher Street and east of Pepper Road, in Frankford.
Eagles Nest Fellowship Church Inc. proposes to install pump station and both force main and gravity sewer main and manholes to serve a 110-bed unit senior care facility located on Zion Church Road, in Milton.
Delaware Electric Cooperative proposes to install a pump station, force main, gravity sewer main and manholes to serve 37.5 EDUs at 14198 Sussex Highway, in Greenwood.
Beazer Homes, LLC proposes to install a pump station along with related gravity sewer and force main, to serve 86 single family lots and 90 townhouse lots on Daisey Road, near Frankford.
The City of Milford proposes to install a regional sewage pump station designed to serve the proposed Milford Corporate Center property, adjacent developments and provide service to the Northwest part of the City of Milford.
CNR Land Development, LLC proposes to install a pump station, gravity and force main, and manholes to serve 191 single family lots and a clubhouse in a proposed subdivision on Cave Neck Road near Milton.
Cherner Development Group proposes to install a pump station, gravity sewer and force main to serve a carwash on the southwest corner of John J. Williams Hwy. and Warrington Rd., in Sussex County.
Grayway Developers, Inc. proposes to install a pump station and approximately 165 linear feet of force main west of Indian Mission Road and Harmon’s Hill Road, in Millsboro, to serve 68 equivalent dwelling units.
Twin Masts proposes to install a pump station, 1,741 feet of force main, 10,423 feet of gravity sewer main and 48 manholes to serve 249 single family lots and a pool house located on Block Round Pole Bridge Road, Milton.
First Industrial Realty Trust, Inc proposes to install a pump station, gravity sanitary sewer main and force main connected to the existing sanitary sewer main at the intersection of Airport Road and New Churchmans Road.
Insight Land Company proposes to install a pump station, sewer main and force main to serve 174 units in a residential development located at Milford Harrington Hwy in Harrington.
The Town of Smyrna proposes to install a pump station, sewer main and force main to serve approximately 500 units in the proposed Simons Corner Apartments subdivision.
Sally A. Dickerson, Trustee proposes to install a pump station, gravity sewer main and force main to serve 18 campsites located on Pickering Beach Road, Dover.
Azalea Woods LLC proposes to install a pump station, gravity sewer and force main to serve 60 single family lots at Gravel Hill Road and Shingle Point Road, near Milton.
Hollyville Buyer, LLC proposes to install a pump station, gravity sewer lines and force main to serve 196 single family lots and a pool house located on Hollyville Road, in Harbeson.
Ribera Development, LLC proposes to install a pump station, force main, and related appurtenances to serve 336 single family lots, a clubhouse and pool located on the south side of Shingle Point Road, Milton.
Sussex County Engineering proposes to install a pump station, gravity sewer and force main at 34899 Delaware Ave, Frankford, to serve 47-lots with a stub for future connection of 137 EDUs.
JLAM GT Oaks, LLC proposes to install a pump station, approximately 1,146 feet of force main and related appurtenances to serve 367 units and 2 pool houses in the Oaks at Georgetown.
Sand Hill, LLC proposes to install a pump station and approximately 9,761 linear feet of gravity sewer to serve a 180-lot residential subdivision with a pool and pool house located on the south side of Sand Hill Rd. in Milton.
West Selbyville Development, LLC proposes to install a new pump station and approximately 5,000 linear feet of force main to serve 488 equivalent dwelling units in two subdivisions in Selbyville.
The Town of Millsboro proposes to install a new pumping station (with related force main) to replace an existing pumping station located at 499 Mitchell St, in Millsboro.
Bridgeville Development Co. LLC proposes to install a pump station and force main to serve 342 multifamily dwelling units, 2 clubhouses, retail space, restaurants and a hotel in a proposed mixed-use development between routes US 13 and DE 404 within the limits of the Town of Bridgeville.
Sussex Technical School District proposes to install 4,023 linear feet of gravity sewer main, a new pump station and 50 linear feet of force main that tie into the existing force main currently serving the campus.
Artesian Wastewater Management, Inc. proposes to modify a sewer pump station in Milton.
SB North, LLC proposes to install a suction lift duplex sewer pump station, sanitary sewer force main and related appurtenances to serve homes in the proposed Monarch residential subdivision located in Middletown.
Riverwood Development, LLC proposes to install an adaptive non-clog pump station, sanitary sewer force main and related appurtenances to the proposed Riverwood residential subdivision.
New Castle County Department of Public Works poses to install a pump station, force main and related appurtenances to connect the pump station, to be located in the Carter Farm subdivision, to offsite force mains.
Reese Associates, LLC proposes to install a pump station, forcemain and related appurtenances to serve a 48-unit apartment community located at 8093 South DuPont Highway, in Kent County.
Lioncap, LLC proposes to install a pump station, force main and gravity lines, manholes and related appurtenances to serve 86 existing residential lots and 87 proposed lots in the Governor’s Glen subdivision, in Bear.
Red Lion HP LLC proposes to install a pump station, approximately 2,085 linear feet of force main and related appurtenances to serve 240 townhome units in the proposed Vista at Red Lion residential subdivision on the north side of Old Porter Road, in Bear.
Schiff Land Development Co., LLC proposes to install a pump station, sewer main and force main, and related appurtenances to serve 127 single family homes in the proposed Patriots Crest subdivision on South State Street northwest of Banning Road, in Kent County.
Sussex County proposes to install two pump stations and approximately 350 linear feet of force main to replace 55 on-site septic systems within the Oak Acres subdivision in Frankford and connect the housing units to a county sewer main.
Baywood LLC has applied for a permit to install a pump station and approximately 1,167 seven linear feet of force main, and related appurtenances, to serve the Baywood Garden Villas residential development, located at 32147 Long Neck Road, in Sussex County.
Hishners, LLC proposes to install three low pressure pump stations and approximately 595 linear feet of force main and related appurtenances to serve the businesses at Liberto Plaza, located at 1502 East Lebanon Road, east of Camden-Wyoming.
Bunting Mack LLC proposes to install a pump station, approximately 4,023 linear feet of force main and related appurtenances to serve the Coastal Villages-Phase 2 residential development, located southeast of Roxana Road, Selbyville.
Fusco Properties proposes to install a pump station, approximately 65 linear feet of force main and related appurtenances to serve 226 detached single-family homes in the proposed Stratus Estates subdivision located southeast of Harbeson.
Kaestone Bay proposes to install a pump station, approximately 1,815 linear feet of force main and related appurtenances to serve 194 proposed single-family homes in the Kaestone Bay subdivision, northeast of Millsboro.
McKee Cap LLC has applied for a permit for a pump station and approximately 1,467 linear feet of main and related appurtenances to serve the McKee Road Apartments, at 1385 McKee Road, in Dover.
Ribera Development proposes to install a pump station, approximately 4,905 linear feet of force main and related appurtenances to serve 329 residential lots, a pool and clubhouse in the proposed Westwood subdivision located on Williamsville Road, in Milford.
FR Land Investment proposes to install a pump station, approximately 1,487 linear feet of force main and related appurtenances to serve the proposed Monarch Glen residential development, located on Fisher Road southeast of the intersection with Lewes Georgetown Highway in Sussex County.
McKee Builders proposes to install a pump station, approximately 3,157 linear feet of force main, and related appurtenances, to serve 137 proposed single family homes in the Pennfield subdivision, on the south side of Port Penn Road, north of Odessa.
The City of Seaford proposes to install a temporary pump station and 1,792 linear feet of forcemain to serve the Western Sussex Business Campus-Phase 2, located between Ross Station Road and Venture Drive, in Seaford.
Sandhill Real Estate Investments proposes to install a pump station and approximately 1,618 linear feet of force main to serve the existing residential subdivision of Vines at Sandhill, in Georgetown.
Sussex County is proposing to renovate an existing pump station and install approximately 4,000 linear feet of force main to help replace an existing failing on-site wastewater disposal system in the Pintail Pointe subdivision, near Milton.
Schell Brothers, LLC, proposes to install a pump station, approximately 3,251 linear feet of force main to serve 104 proposed single family homes in the Autumndale subdivision, on Hollyville Road, southeast of Harbeson.
Sussex County Engineering has applied for a permit to construct a pump station and 3,100 linear feet of forcemain to serve the existing Lochwood subdivision, on Lakeshore Drive, in Lewes.
Estuary Development proposes to install a pump station, approximately 2,498 linear feet of force main and related appurtenances to 115 proposed homes and 55 existing homes located south of Oceanview and east of Roxana.
Sussex County proposes to install a pump station and approximately 7,157 linear feet of force main to serve the Joy Beach community and dwellings along Bookhammer Landing Rd., Waterview Rd. and Camp Arrowhead Rd. southeast of Marshtown and the John J. Williams Highway.