Delaware.gov logo
Listen to this page using ReadSpeaker

 Pages Tagged With: "force main"

Dolby Property North WPCC 3080/24

D.R. Horton, Inc. proposes to install a submersible pumping station, sanitary sewer force main and gravity main, and manholes to serve 157 residential lots near the intersection of Old Furnace Road and State Route 13 in Smyrna.


The Grove at Bayberry WPCC 3079/24

Bayberry East-West LLC proposes to install a pumping station, sanitary force main and gravity main and manholes to serve 149 single family detached and 27 single family attached units at The Grove at Bayberry in Middletown.


Delaware Electric Cooperative Sewer Extension WPCC Permit 3075/24

Delaware Electric Cooperative proposes to install a pump station, force main, gravity sewer main and manholes to serve 37.5 EDUs at 14198 Sussex Highway, in Greenwood.


Eagles Nest Senior Care Facility WPCC Permit 3074/24

Eagles Nest Fellowship Church Inc. proposes to install pump station and both force main and gravity sewer main and manholes to serve a 110-bed unit senior care facility located on Zion Church Road, in Milton.


Harmon’s Hill Force Main Extension WPCC 3084/23

Artesian Water Management, Inc. proposes to move the force main from the south to north side of Harmons Hill Road, in Millsboro.


Sycamore Chase Expansion WPCC 3069/24

Beazer Homes, LLC proposes to install a pump station along with related gravity sewer and force main, to serve 86 single family lots and 90 townhouse lots on Daisey Road, near Frankford.


Waves Rt. 24 Carwash WPCC 3064/24

Cherner Development Group proposes to install a pump station, gravity sewer and force main to serve a carwash on the southwest corner of John J. Williams Hwy. and Warrington Rd., in Sussex County.


Paradise Meadows WPCC Permit 3066/24

CNR Land Development, LLC proposes to install a pump station, gravity and force main, and manholes to serve 191 single family lots and a clubhouse in a proposed subdivision on Cave Neck Road near Milton.


North Duck Creek Utility Extension Phase 2 WPCC 3059/24

The Town of Smyrna proposes to install approximately 1,250 feet of force main to serve future facilities on the State of Delaware warehouse parcel near the Intersection of Dupont Highway and Duck Creek Road.


Armada Subdivision Pump Station WPCC 3058/24

Grayway Developers, Inc. proposes to install a pump station and approximately 165 linear feet of force main west of Indian Mission Road and Harmon’s Hill Road, in Millsboro, to serve 68 equivalent dwelling units.


King Cole Farms Campground WPCC 3050/24

Sally A. Dickerson, Trustee proposes to install a pump station, gravity sewer main and force main to serve 18 campsites located on Pickering Beach Road, Dover.


Walker Farms Industrial Development WPCC 3046/24

First Industrial Realty Trust, Inc proposes to install a pump station, gravity sanitary sewer main and force main connected to the existing sanitary sewer main at the intersection of Airport Road and New Churchmans Road.


Harrington Gardens WPCC 3048/24

Insight Land Company proposes to install a pump station, sewer main and force main to serve 174 units in a residential development located at Milford Harrington Hwy in Harrington.


Simons Corner Pump Station WPCC 3049/24

The Town of Smyrna proposes to install a pump station, sewer main and force main to serve approximately 500 units in the proposed Simons Corner Apartments subdivision.


Cavaliers Country Club Pumping Stations WPCC Permit 3036/24

Cavaliers Redevelopment, LP proposes to build two pump stations and related force main to serve 718 residential units, a banquet facility and a clubhouse in the Cavaliers Country Club subdivision located at 100 Addison Drive near Newark.


DelDOT West Camden Bypass WPCC Permit 3033/24

Camden Wyoming Sewer and Water Authority proposes to install 371 feet of force main to relocate existing force main because of impacts from DelDOT’s West Camden Bypass project.


Azalea Woods Phase 3 WPCC Permit 3030/24

Azalea Woods LLC proposes to install a pump station, gravity sewer and force main to serve 60 single family lots at Gravel Hill Road and Shingle Point Road, near Milton.


Turnberry WPCC 3029/24

Hollyville Buyer, LLC proposes to install a pump station, gravity sewer lines and force main to serve 196 single family lots and a pool house located on Hollyville Road, in Harbeson.


Countryside Hamlet Sanitary Sewer WPCC 3028/24

Sussex County Engineering proposes to install a pump station, gravity sewer and force main at 34899 Delaware Ave, Frankford, to serve 47-lots with a stub for future connection of 137 EDUs.


Estates at Walden WPCC 3027/24

Burtons Pond, LLC. proposes to install over 1,500 feet of force main to serve a 21-lot single family residential subdivision located near John J. Williams Highway and Sloan Road.


Four Winds Farm Subdivision WPCC 3025/24

Ribera Development, LLC proposes to install a pump station, force main, and related appurtenances to serve 336 single family lots, a clubhouse and pool located on the south side of Shingle Point Road, Milton.


Rookery Golf Course to Woodfield Expansion Force Main WPCC 3021/24

Artesian Wastewater Management, Inc. proposes to install approximately 428 linear feet of force main from the existing Rookery Golf Course force main to the proposed Woodfield Preserve Expansion subdivision force main.


Oaks at Georgetown Pump Station WPCC 3020/24

JLAM GT Oaks, LLC proposes to install a pump station, approximately 1,146 feet of force main and related appurtenances to serve 367 units and 2 pool houses in the Oaks at Georgetown.


Kingfisher Pump Station WPCC 3024/24

West Selbyville Development, LLC proposes to install a new pump station and approximately 5,000 linear feet of force main to serve 488 equivalent dwelling units in two subdivisions in Selbyville.


Sussex Technical High School Pump Station WPCC 3015/24

Sussex Technical School District proposes to install 4,023 linear feet of gravity sewer main, a new pump station and 50 linear feet of force main that tie into the existing force main currently serving the campus.


Bridgeville Town Center WPCC 3014/24

Bridgeville Development Co. LLC proposes to install a pump station and force main to serve 342 multifamily dwelling units, 2 clubhouses, retail space, restaurants and a hotel in a proposed mixed-use development between routes US 13 and DE 404 within the limits of the Town of Bridgeville.


Sewage Pumping Station No 4 Improvements WPCC 3010/24

The Town of Millsboro proposes to install a new pumping station (with related force main) to replace an existing pumping station located at 499 Mitchell St, in Millsboro.


Wastewater Facilities Construction Permit Application: WPCC 3000/24

New Castle County Department of Public Works poses to install a pump station, force main and related appurtenances to connect the pump station, to be located in the Carter Farm subdivision, to offsite force mains.


Wastewater Facilities Construction Permit Application: Blue Beach Bungalows DE, LLC

Blue Beach Bungalows DE, LLC proposes to install eleven pump stations, several lines of force main and related appurtenances to serve 199 RV units in the Pine Haven Campground, located at 22506 Corey Drive, in Lincoln.


Wastewater Facilities Construction Permit Application: Mobile Gardens MHP LLC

Mobile Gardens MHP LLC proposes to install approximately 330 linear feet of force main and related appurtenances to serve 26 units in Section “C” of the Mobile Gardens mobile home park, located on the south side of Brickyard Road in Seaford.


Wastewater Facilities Construction Permit Application: Artesian Water Management, Inc.

Artesian Water Management, Inc. proposes to install sections of force main to connect from Independence along Harmons Hill Road to Townsend Road and on Franklin Roosevelt Lane to tie-in to existing force mains.


Wastewater Facilities Construction Permit Application: Twin Lakes Associates II LLC

Twin Lakes Associates II LLC proposes to replace two existing pumps and install approximately 39 linear feet of force main and related appurtenances to serve 24 apartment units in the proposed Village of Twin Lakes residential development, located at 1 North Twin Lakes Boulevard in Newark.


Wastewater Facilities Construction Permit Application: Red Lion HP LLC

Red Lion HP LLC proposes to install a pump station, approximately 2,085 linear feet of force main and related appurtenances to serve 240 townhome units in the proposed Vista at Red Lion residential subdivision on the north side of Old Porter Road, in Bear.


Wastewater Facilities Construction Permit Application: Schiff Land Development Co., LLC

Schiff Land Development Co., LLC proposes to install a pump station, sewer main and force main, and related appurtenances to serve 127 single family homes in the proposed Patriots Crest subdivision on South State Street northwest of Banning Road, in Kent County.


Wastewater Facilities Construction Permit Application: The Town of Millsboro

The Town of Millsboro proposes to install a force main and beneficial reuse main connected to an existing pump station to pump treated wastewater to several spray irrigation properties from the proposed White Farm Wastewater Treatment Plant in Millsboro.


Wastewater Facilities Construction Permit Application: Sussex County

Sussex County proposes to install two pump stations and approximately 350 linear feet of force main to replace 55 on-site septic systems within the Oak Acres subdivision in Frankford and connect the housing units to a county sewer main.


Wastewater Facilities Construction Permit Application: Baywood LLC

Baywood LLC has applied for a permit to install a pump station and approximately 1,167 seven linear feet of force main, and related appurtenances, to serve the Baywood Garden Villas residential development, located at 32147 Long Neck Road, in Sussex County.


Wastewater Facilities Construction Permit Application: Hishners, LLC

Hishners, LLC proposes to install three low pressure pump stations and approximately 595 linear feet of force main and related appurtenances to serve the businesses at Liberto Plaza, located at 1502 East Lebanon Road, east of Camden-Wyoming.


Wastewater Facilities Construction Permit Application: Fusco Properties

Fusco Properties proposes to install a pump station, approximately 65 linear feet of force main and related appurtenances to serve 226 detached single-family homes in the proposed Stratus Estates subdivision located southeast of Harbeson.


Wastewater Facilities Construction Permit Application: Kaestone Bay, LLC

Kaestone Bay proposes to install a pump station, approximately 1,815 linear feet of force main and related appurtenances to serve 194 proposed single-family homes in the Kaestone Bay subdivision, northeast of Millsboro.


Wastewater Facilities Construction Permit Application: McKee Cap LLC

McKee Cap LLC has applied for a permit for a pump station and approximately 1,467 linear feet of main and related appurtenances to serve the McKee Road Apartments, at 1385 McKee Road, in Dover.


Wastewater Facilities Construction Permit Application: Ribera Development, LLC

Ribera Development proposes to install a pump station, approximately 4,905 linear feet of force main and related appurtenances to serve 329 residential lots, a pool and clubhouse in the proposed Westwood subdivision located on Williamsville Road, in Milford.


Wastewater Facilities Construction Permit Application: PR-Stolz PropCo Blue Diamond LLC

PR-Stolz PropCo Blue Diamond LLC proposes to install approximately 854 linear feet of force main and related appurtenances to serve Blue Diamond Park Lots 2A, 3 and 4, at 800 Federal Lane and 777 and 765 Hamburg Road, in New Castle.


Wastewater Facilities Construction Permit Application: McKee Builders

McKee Builders proposes to install a pump station, approximately 3,157 linear feet of force main, and related appurtenances, to serve 137 proposed single family homes in the Pennfield subdivision, on the south side of Port Penn Road, north of Odessa.


Wastewater Facilities Construction Permit Application: Artesian Wastewater Management

Artesian Wastewater Management proposes to install approximately 5,594 linear feet of force main to connect a proposed subdivision on Cool Spring Road to an existing wastewater system.


Wastewater Facilities Construction Permit Application: New Castle County

New Castle County proposes to install approximately eighteen thousand linear feet of parallel 10- and 16-inch force main to provide central sanitary sewer service to the west wing portion of the New Castle County southern sewer service area.


Wastewater Facilities Construction Permit Application: Sandhill Real Estate Investments

Sandhill Real Estate Investments proposes to install a pump station and approximately 1,618 linear feet of force main to serve the existing residential subdivision of Vines at Sandhill, in Georgetown.


Wastewater Facilities Construction Permit Application: City of Seaford

The City of Seaford proposes to install a temporary pump station and 1,792 linear feet of forcemain to serve the Western Sussex Business Campus-Phase 2, located between Ross Station Road and Venture Drive, in Seaford.


Wastewater Facilities Construction Permit Application: Sussex County

Sussex County is proposing to renovate an existing pump station and install approximately 4,000 linear feet of force main to help replace an existing failing on-site wastewater disposal system in the Pintail Pointe subdivision, near Milton.


Wastewater Facilities Construction Permit Application: Kent County Levy Court

Kent County Levy Court proposes to install approximately 2,000 linear feet of force main to re-locate existing force main so it doesn’t interfere with proposed DelDOT construction at the intersection of Rising Sun Road and State Route 10.





+