Delaware.gov logo
Listen to this page using ReadSpeaker

 Pages Tagged With: "dcmp"

Federal Consistency Determination: HUD 439 Bradford Street (2025.0003)

The applicant proposes to use HUD public development funds for reconstruction and improvements to utilities at 439 Bradford Street, in Wilmington.


Determinación Federal de Congruencia: HUD 439 Bradford Street (2025.0003)

El solicitante propone utilizar fondos públicos de desarrollo del Departamento de Vivienda y Desarrollo Urbano para reconstruir y mejorar servicios públicos en 439 Bradford Street, Wilmington.


Federal Consistency Review Responses

This page is a collection of Coastal Zone Management Federal Consistency review responses from DNREC’s Delaware Coastal Programs. Federal Consistency Reviews help ensure that state and federal actions in the Coastal Zone are consistent and coordinated. Activity reviews requiring public notification are posted on the DNREC Public Notices page.


Federal Consistency Determination: NMFS Commercial Electronic Reporting Amendment (2024.0041)

The National Marine Fisheries Service proposes to promulgate a rule to implement the Commercial Electronic Reporting Amendment for the Gulf of Mexico and Atlantic Region.


Determinación Federal de Congruencia: Enmienda al Informe Electrónico Comercial del NMFS (2024.0041)

El Servicio Nacional de Pesca Marina propone promulgar una norma para implementar la Enmienda al Informe Electrónico Comercial para el Golfo de México y la Región del Atlántico.


Detèminasyon Konsistans Federal: Amannman pou Rapò Elektwonik Komèsyal NMFS (2024.0041)

Sèvis Nasyonal Lapèch Marin pwopoze pou pibliye yon règ pou aplike Amannman pou Rapò Elektwonik Komèsyal pou Gòlf Meksik la ak Rejyon Atlantik la.


Federal Consistency Determination: HUD 413 Eleventh Street (2025.0001)

The applicant proposes to use HUD public development funds to build two semi-detached housing units at 413 Eleventh Street, in New Castle.


Federal Consistency Determinations: HUD Sussex County Habitat for Humanity Projects

The U.S. Department of Housing and Urban Development proposes to provide financial assistance to Sussex County Habitat for Humanity for projects in Bridgeville, Greenwood and Laurel.


Federal Consistency Certification: Savannah Farms Residential Subdivision (2024.0060)

D.R. Horton plans to use a Corps of Engineers nationwide permit to build stormwater management facilities associated with a proposed 1,114-unit residential subdivision northeast of the intersection of Moose Lodge Road and Willow Grove Road, in Wyoming.


Sètifikasyon Konsistans Federal: Ibanizasyon Savannah Farms (2024.0060)

D.R. Horton planifye pou itilize yon pèmi nasyonal Corps of Engineers pou konstwi enstalasyon jesyon dlo lapli ki asosye ak yon pwopozisyon 1,114-inite rezidansyèl ibanizasyon nan nòdès entèseksyon Moose Lodge Road ak Willow Grove Road nan Wyoming.


Federal Consistency Determination: USDA Bodine Farms (2024.0061)

Bodine Farms proposes to use USDA Rural Development funds for the construction of 324 ground-mounted solar panels at 1652 Hourglass Rd, in Hartly.


Federal Consistency Determination: USDA What Came First Solar (2024.0062)

What Came First LLC proposes to use USDA Rural Development funds for the construction of 336 ground-mounted solar panels at 2219 Morgans Choice Road, in Camden.


Federal Consistency Certification: Indian River Inlet Dredging and Beneficial Use Project (2024.0054)

An update to DNREC Notice No. CCE20240324 (9/11/24) regarding a dredging and beneficial use project at Indian River Inlet.


Federal Consistency Determination: USDA Brown Solar Project (2024.0055)

The U.S. Department of Agriculture, Rural Development proposes to provide financial assistance for the construction of 120 ground mounted solar panels at 4795 Milford Harrington Hwy, in Harrington.


Federal Consistency Certification: Indian River Inlet Dredging and Beneficial Use Project (2024.0054)

The DNREC Division of Watershed Stewardship proposes to use a U.S. Army Corp of Engineers permit to dredge material from three potential borrow sites and use it to restore parts of the North Beach berm and dune system near the Indian River Inlet.


Federal Consistency Certification: New Jersey Wind Port Phase 2 (2024.0050)

The New Jersey Economic Development Authority proposes to redevelop portions of the Salem and Hope Creek Generating Station and former U.S. Army Corp of Engineers Artificial Island Confined Disposal Facility Cell No. 3.


Certificación Federal de Congruencia al Programa de Gestión Costera: Puerto Eólico de Nueva Jersey, Fase 2 (2024.0050)

La Autoridad de Desarrollo Económico de Nueva Jersey propone reconstruir partes de la Estación Generadora de Salem y Hope Creek y la antigua Celda No. 3 de la Instalación de Eliminación Confinada de Isla Artificial del Cuerpo de Ingenieros del Ejército de EE. UU.


Federal Consistency Certification: New Jersey Wind Port Faz 2 (2024.0050)

New Jersey Economic Development Authority (Otorite Devlopman Ekonomik New Jersey) pwopoze pou re-devlopman pòsyon Estasyon Jenerasyon Salem ak Hope Creek ak ansyen Kò Enjenyè Lame Ameriken an, Selil Nimewo 3 a Artificial Island Confined Disposal Facility.


Federal Consistency Certification: Anchor Way Shoreline Improvements (2024.0051)

Anchor Way, LLC proposes to use a Corps of Engineers permit for shoreline improvements, including placement of sand fill and installation of two stone groins to protect an existing deck at 116 Anchor Way, Dewey Beach.


USACE L&R Canal Maintenance Dredging (2024.0048)

The U.S. Army Corps of Engineers proposes to maintenance dredge two sections of the Lewes and Rehoboth Canal in Sussex County, in two phases.


Federal Consistency Determination: HUD Willis Road (2024.0042)

The U.S. Dept. of Housing and Urban Development proposes to provide financial assistance to Central Delaware Habitat for Humanity for the construction of a single-family home at 106 and 108 Willis Road, Dover.


Federal Consistency Determination: HUD Cecil Street (2024.0043)

The U.S. Dept. of Housing and Urban Development proposes to provide financial assistance to Central Delaware Habitat for Humanity for the construction of a single-family home at 229 Cecil Street, Dover.


Federal Consistency Certification: Jones Docking Project (2024.0047)

Dr. Blair and Melissa Jones propose to use a federal permit to repair and replace existing access steps and pier, repair replace and enlarge an existing dock, and install a new side-mount boat lift and floating kayak dock in the Lewes and Rehoboth Canal at 73 Tidewaters, Henlopen Acres.


Federal Consistency Certification: Fishers Cove Dock Condominium (2024.0044)

Burke & Rutecki, LLC proposes to use a Corps of Engineers permit to install a boat lift in an existing boat slip within the Fishers Cove Dock Condominium in the Lewes and Rehoboth Canal in Lewes.


Federal Consistency Certification: Meoli Dock and Boat Lift (2024.0045)

Michael Meoli proposes to use a Corps of Engineers permit to build a dock and boat lift in the Lewes and Rehoboth Canal at 50 Thompson Court, in Rehoboth Beach.


Federal Consistency Certification: ESNG DEMEC Service Line Site 5 (2024.0049)

Eastern Shore Natural Gas proposes to use a Federal Energy Regulatory Commission authorization to construct internal line inspection equipment at two existing pipeline systems, in New Castle and Kent Counties.


US Wind Federal Consistency Certifications

The DNREC Coastal Management Program (DCMP) received two federal consistency certifications (pursuant to 15 CFR 930 subparts D and E) for the proposed US Wind Project proposed off the coast of Maryland with landfall at 3R’s Beach and interconnection on tax parcel 233-2.00-2.01 adjacent to the Indian River Power Plant in Sussex County, Delaware.


Federal Consistency Determination: HUD Seaford Townhomes (2024.0040)

The U.S. Dept. of Housing and Urban Development proposes to provide financial assistance to Sussex County Habitat for Humanity for nine townhomes on North Porter Street, in Seaford.


Determinación Federal de Congruencia: HUD Seaford Townhomes (2024.0040)

El Departamento de Vivienda y Desarrollo Urbano de EE. UU. propone brindar asistencia financiera a Hábitat para la Humanidad del condado de Sussex para nueve viviendas adosadas en North Porter Street, Seaford.


Detèminasyon Konsistans Federal: HUD Seaford Townhomes (2024.0040)

Ministè Etazini pou lojman ak devlopman vil ofri pou l bay Sussex County Habitat for Humanity bourad lajan pou yo ka konstwi nèf kay endividyèl nan North Street, Seaford.


Federal Consistency Certification: ESNG Irish Hill M&R Station (2024.0038)

Eastern Shore Natural Gas proposes to install a natural gas lateral line and a new meter station in Felton.


Federal Consistency Determination: USDA Choi Solar Project (2024.0039)

The U.S. Department of Agriculture proposes to fund the installation of a ground-mounted solar system at 33310 Horsey Church Rd, Laurel.


Federal Consistency Determination: NFMS Whale Collision Speed Reduction (2024.0036)

The National Marine Fisheries Service has proposed amendments to the existing North Atlantic right whale vessel speed rule to further reduce the likelihood of mortalities and serious injuries from vessel strikes.


Determinación Federal de Congruencia: Disminución de la Velocidad para Reducir Colisiones con Ballenas de NFMS (2024.0036)

El Servicio Nacional de Pesca Marina propuso enmiendas a la norma vigente sobre la velocidad de los buques para reducirá las probabilidades de muertes y lesiones graves de ballenas francas en peligro de extinción debido.


Verifye Regilarite Federal: NFMS Whale Collision Speed Reduction (2024.0036)

Sèvis Nasyonal Lapèch Maritim nan te pwopoze chanjman nan règleman ki gen nan bato moman an konsènan vitès nan Atlantik Nò a pou plis diminye ris ki genyen pou balèn nwa k ap disparèt yo mouri e pou yo blese akoz bato k ap frape ansanm.


Federal Consistency Determination: USACE SPGP-20 Reissue (2024.0035)

The Corps of Engineers proposes to reissue a general permit authorizing certain existing and proposed piers, docks, mooring piles, boat lifts, breakwaters, and the replacement of existing serviceable bulkhead structures.


Determinación Federal de Congruencia: USACE SPGP-20 Reissue (2024.0035)

El Cuerpo de Ingenieros propone volver a emitir el permiso general autoriza determinados, tanto existentes como propuestos, muelles, dársenas, muelles de pilotes, elevadores de embarcaciones, rompeolas y la sustitución de estructuras de mamparos.


Verifye Regilarite Federal: USACE SPGP-20 Reissue (2024.0035)

Gwoup Enjenyè Lame Ameriken an pwopoze pou rebay Pèmi jeneral bay otorizasyon pou kèk pilye, waf, kote pou demaraj, asansè bato, zouti pou kraze vag, ki la deja, ansanm ak ranplasman konstriksyon separatè.


Federal Consistency Determination: USDA Schlitter Wildlife Pond (2024.0034)

The USDA Farm Service Agency proposes to fund the construction of a shallow water wildlife pond at 24106 Cedar Lane, Georgetown.


Determinación Federal de Congruencia: Estanque Silvestre de USDA Schlitter (2024.0034)

La Agencia de Servicios Agrícolas del USDA propone financiar la construcción de un estanque de vida silvestre de aguas poco profundas en 24106 Cedar Lane, Georgetown.


Federal Consistency Certification: ESNG Internal Line Inspections (2024.0033)

Eastern Shore Natural Gas proposes to use a Federal Energy Regulatory Commission Automatic Blanket Certificate to install permanent above-ground piping, below-ground piping and valves at existing ESNG locations throughout Delaware.


Federal Consistency Determination: Tri Oak Farm Irrigation (2024.0028)

The USDA proposes to provide financial assistance for the installation of four irrigation pumps and the removal of the existing irrigation system at four sites on Tri Oak Farms, between Laurel and Bethel.


Federal Consistency Determination: NOAA OMAO Vessel Operations (2024.0032)

The NOAA Office of Marine and Aviation Operations has prepared a nationwide consistency determination considering impacts related to vessel operation activities to be undertaken between 2023 and 2038.


Determinación Federal de Congruencia: Operaciones de Buques de la NOAA de la OMAO (2024.0032)

La Oficina de Operaciones Marinas y de Aviación de NOAA ha preparado una determinación de consistencia a nivel nacional que considera los impactos relacionados con las actividades de operaciones de buques que se llevarán a cabo entre 2023 y 2038.


Desizyon Konfòmite Federal: Fonksyònman Bato NOAA OMAO (2024.0032)

Biwo Ki Responsab Bato ak Avyon nan NOAA a te prepare yon rapò ki gen eleman ki gen respekte règleman yo pou tout peyi a ki konsidere enpak ki gen rapò ak aktivite fonksyònman bato ki gen pou fèt ant 2023 ak 2038.


Federal Consistency Determination: H&V Farm Solar (2024.0029)

USDA Rural Development proposes to provide financial assistance for the installation of a ground-mounted solar energy system on H&V Farms, located at 30399 Ross Point Rd, Laurel.


Federal Consistency Certification: ESNG Armstrong Corner M&R Station (2024.0031)

Eastern Shore Natural Gas proposes to use a Federal Energy Regulatory Commission authorization for the installation of gas metering and regulating upgrades within an existing natural gas facility at 465 Armstrong Corner Rd., in Middletown.


Federal Consistency Certification: Port Mahon Maintenance Dredging Modification (2024.0023)

The Delaware Storage and Pipeline Company is proposing to amend a U.S. Army Corps of Engineers authorization to include a second confined disposal facility option at Artificial Island for the Port Mahon maintenance dredging project.


Federal Consistency Certification: Buckalew Retaining Wall and Backfill (2024.0026)

The Buckalew family is proposing to use a U.S. Army Corps of Engineers Nationwide Permit for the construction and backfill of a retaining wall impacting approximately 0.044 acres of wetland on Love Creek, in Lewes.


Federal Consistency Certification: Chesapeake Utilities Canary Creek (2024.0027)

Chesapeake Utilities Corporation proposes to use a U.S. Army Corps of Engineers Nationwide Permit for the installation of a natural gas line beneath Canary Creek and its adjacent wetlands southeast of the New Road bridge in Lewes.





+