Delaware.gov logo

Application Materials: DSWA Southern Solid Waste Management Center Landfill Permit Renewal and Landfill Expansion



This page lists and links to the application materials referred to in DNREC Public Notice WHS20250323, published on Sept. 7, 2025.

01 – Application Table of Contents

02 – Application Checklist

03 – Letter of Intent

04 – Facility Application

05 – Proof of Property Ownership

06 – Operation Plan

07 – Engineering Report

08 – Engineering Report Appendix A (Calculation Manual Part A-1)

09 – Engineering Report Appendix A (Calculation Manual Part A-1 continued)

10 – Engineering Report Appendix A (Calculation Manual Parts A-2 through A-5)

11 – Engineering Report Appendix B (Technical Specifications)

12 – Engineering Report Appendix C (Construction Quality Assurance Plan)

13 – Engineering Report Appendix D (Drawings)

14 – Engineering Report Appendix D (Drawings continued)

15 – Engineering Report Appendix E (Leachate Tank Drawings)

16 – Hydrogeological Assessment

17 – Hydrogeological Assessment Appendix A (Cell 6 Boring Logs and Permits)

18 – Hydrogeological Assessment Appendix B (Cell 6 Groundwater Monitoring Elevations and Contour Maps 01)

19 – Hydrogeological Assessment Appendix B (Cell 6 Groundwater Monitoring Elevations and Contour Maps 02)

20 – Hydrogeological Assessment Appendix B (Cell 6 Groundwater Monitoring Elevations and Contour Maps 03)

21 – Hydrogeological Assessment Appendix B (Cell 6 Groundwater Monitoring Elevations and Contour Maps 04)

22 – Hydrogeological Assessment Appendix B (Cell 6 Groundwater Monitoring Elevations and Contour Maps 05)

23 – Hydrogeological Assessment Appendix B (Cell 6 Groundwater Monitoring Elevations and Contour Maps 06)

24 – Hydrogeological Assessment Appendix B (Cell 6 Groundwater Monitoring Elevations and Contour Maps 07)

25 – Hydrogeological Assessment Appendix B (Cell 6 Groundwater Monitoring Elevations and Contour Maps 08)

26 – Hydrogeological Assessment Appendix B (Cell 6 Groundwater Monitoring Elevations and Contour Maps 09)

27 – Hydrogeological Assessment Appendix B (Cell 6 Groundwater Monitoring Elevations and Contour Maps 10)

28 – Hydrogeological Assessment Appendix B (Cell 6 Groundwater Monitoring Elevations and Contour Maps 11)

29 – Hydrogeological Assessment Appendix B (Cell 6 Groundwater Monitoring Elevations and Contour Maps 12)

30 – Hydrogeological Assessment Appendix B (Cell 6 Groundwater Monitoring Elevations and Contour Maps 13)

31 – Hydrogeological Assessment Appendix C (Slug Test Data and Groundwater Velocity Calculations)

32 – Hydrogeological Assessment Appendix D (Cell 6 Historical Groundwater Quality Data)

33 – Geotechnical Design Report

34 – Geotechnical Design Report Appendices

35 – Environmental Assessment

36 – Topographic and Site Location Maps

37 – Proof of Zoning Approvals and Permits

38 – Closure Plans

39 – Financial Assurance

40 – Other Related Materials

41 – Siting Requirements




+