Delaware.gov logo
Listen to this page using ReadSpeaker

 Pages Tagged With: "docking"

Wetlands and Waterways Permit Applications

A listing of recent permit applications submitted to the DNREC Wetlands and Waterways Section.


Federal Consistency Certification: Jones Docking Project (2024.0047)

Dr. Blair and Melissa Jones propose to use a federal permit to repair and replace existing access steps and pier, repair replace and enlarge an existing dock, and install a new side-mount boat lift and floating kayak dock in the Lewes and Rehoboth Canal at 73 Tidewaters, Henlopen Acres.


Federal Consistency Certification: Paese-Kimbrough Docking Facilities

The applicants propose to build docking facilities consisting of an elevated walkway over vegetated wetlands, a fixed pier, a fixed dock, and a boat lift on the Lewes and Rehoboth Canal, in Lewes.


Federal Consistency Certification: MMW Investments, LLC

MMW Investments, LLC proposes to remove existing, deteriorated docking facilities and construct new docking facilities at 640 Pilottown Road, in Lewes.


Federal Consistency Certifications: Carbone Dock and Pier

The property owner proposes construction of a deck, a retaining wall with stone rip-rap, and docking facilities in the Lewes and Rehoboth Canal at 99 Tidewaters Road, Lewes.





+