Federal Consistency Certification: South Shore Marina Entrance Channel Relocation



Division of Climate, Coastal and Energy

Published: May 8, 2022
Comments Due: June 6, 2022
Documents For Review
Federal Consistency Form

A Federal Consistency Certification has been submitted to the Delaware Coastal Management Program for the following: South Shore Marina Entrance Channel Relocation (2022.0060)

South Shore Moorings, LLC. proposes to relocate the entrance channel of a 92-slip marina to a location with greater depth and low potential for sand deposition to eliminate the need for frequent maintenance dredging. The project would create a new 60-foot wide entrance channel through an existing 46-foot wide rock jetty and close the existing marina entrance channel with 155 linear feet of new rock jetty. Additionally, the project would include the construction of a 150-foot long pile-supported timber wave screen at the new marina entrance and the removal of a 40-foot portion of the existing northerly rock jetty.

Comments concerning this Federal Consistency Certification will be accepted for 30 days from the date of this notice. Comments may be sent to: Delaware Coastal Programs, Ms. Kimberly Cole, Administrator, 100 W. Water Street, Suite 7B, Dover, DE, 19904, or electronically to DNREC_DCP_PublicComment@delaware.gov. For additional information please call (302) 739-9283.




+