Pages Tagged With: "sewer main"
Eagles Nest Fellowship Church Inc. proposes to install pump station and both force main and gravity sewer main and manholes to serve a 110-bed unit senior care facility located on Zion Church Road, in Milton.
Delaware Electric Cooperative proposes to install a pump station, force main, gravity sewer main and manholes to serve 37.5 EDUs at 14198 Sussex Highway, in Greenwood.
CNR Land Development, LLC proposes to install a pump station, gravity and force main, and manholes to serve 191 single family lots and a clubhouse in a proposed subdivision on Cave Neck Road near Milton.
Mulberry Heights, LLC proposes to install approximately 420 linear feet of sanitary sewer main to serve a 17-unit townhome community located at Mulberry Street in Milton.
First Industrial Realty Trust, Inc proposes to install a pump station, gravity sanitary sewer main and force main connected to the existing sanitary sewer main at the intersection of Airport Road and New Churchmans Road.
Insight Land Company proposes to install a pump station, sewer main and force main to serve 174 units in a residential development located at Milford Harrington Hwy in Harrington.
The Town of Smyrna proposes to install a pump station, sewer main and force main to serve approximately 500 units in the proposed Simons Corner Apartments subdivision.
Sally A. Dickerson, Trustee proposes to install a pump station, gravity sewer main and force main to serve 18 campsites located on Pickering Beach Road, Dover.
Sussex Technical School District proposes to install 4,023 linear feet of gravity sewer main, a new pump station and 50 linear feet of force main that tie into the existing force main currently serving the campus.