Pages Tagged With: "dune"
Cindy Bischoff has applied for a permit to construct a single-family dwelling with a cantilevered deck/porch on Lot 11, in Bethany Village.
Jim Stolarski has applied for a permit for construction seaward of the DNREC Building Line to build a single-family dwelling with a cantilevered deck/porch on Lot 10 in the Town of South Bethany.
DNREC has completed the emergency dredging and beach repair project at the North Indian River Inlet Beach. Approximately 480,000 cubic yards of sand was dredged and used for restoration.
The project focused on strengthening shoreline
The Sea Colony Recreational Association has applied for a permit to mechanically scrape sand from the beach to rebuild the dunes on Sea Colony.
The Ocean Breezes Homeowners Association has applied for a permit to mechanically scrape sand from the beach to rebuild the dune at Ocean Breezes, in Sussex County.
Mr. and Mrs. Jeff Chorman have applied for a permit for construction seaward of the DNREC Building Line to construct a single family dwelling with a 10′ cantilevered deck/porch on Lot 4, Block J, Broadkill Beach.
The Town of Slaughter Beach proposes to bring in approximately 5700 cubic yards of sand to rebuild the dune from Sussex Avenue to Simpson Avenue.
Ms. Linda Dressler and Mr. Christopher Randolf have filed an application for a permit for construction seaward of the DNREC Building Line to construct a third floor addition within the footprint of the existing dwelling on Lot 1, Block 40, Dewey Beach.
Mr. and Mrs. Thomas P. Kane have applied for a permit for construction seaward of the DNREC Building Line to construct a single family dwelling with a cantlievered deck/porch on Lot 5, Bayberry Dunes.
Todd Nevin has applied for a permit for construction seaward of the DNREC Building Line to build a single family dwelling with a 12-foot cantilevered deck on Lot 15, Block 1, South Bethany.
The Port Lewes Association of Unit Owners has applied for a permit to construct a dune reinforcement system, including placement of sand, and a pedestrian dune crossover.
Mr. and Mrs. Douglas Duenkel have applied for a permit for construction seaward of the DNREC Building Line to renovate the existing dwelling, including the construction of a new second story and roof on Lot 3, Block A, in Bethany Beach.
McIntyre Beach, LLC has filed an application for a permit for construction seaward of the DNREC Building Line to remove sand from and regrade the west side of the dune on Lot 8, Ocean Breezes, in Sussex County.
Gull’s Nest Homeowners Association has filed an application for a permit for construction seaward of the DNREC Building Line to mechanically scrape sand from the beach to rebuild the dune in Gull’s Nest.